608.276.9200
 
 

UW Extension

URP Accelerator – Suite 300 Tenant Build-out

The project consists of a 24,700 square foot interior 3rd floor build-out in the existing URP Accelerator Building . Construction encompasses nearly the entire floor. The floor plan contains a mixture of both private and open offices with conference rooms throughout.

A curved accent wall stretches through the middle of the suite to add some architectural flare. The accent wall finish includes vinyl wall covering and wood cap. Various soffits throughout the space help define areas.

Twenty-one skylights provide natural light throughout in conjunction with the ribbon windows that wrap the entire floor. A couple of break-out spaces and coffee bars offer locations to grab morning drinks. The break room and Colab are located on the east side of the suite and separated by sliding wood doors with reeded glass.

Location:
Madison, WI

Client:
University Research Park

Size:
24,700 SF

Construction Type:
Interior Build-out